Keel laying of the 8th ASW SWC

 

Keel laying ceremony of the 8th ASW SWC (ex-GRSE) was held at GRSE, Kolkata. The ceremony was presided by VAdm B Sivakumar, Controller Warship Production & Acquisition in presence of Cmde PR Hari, IN (Retd), Chairman & Managing Director, GRSE and other Senior Officials from Indian Navy and M/s GRSE.

The contract for indigenous design and construction of 08 x ASW SWC ships was concluded on 29th  April 19 between MOD and M/s GRSE, Kolkata. As on date six ships of the project have already been launched with delivery of first ship (Arnala) planned in Aug 24.

Arnala Class of ship will replace the in-service Abhay class ASW Corvettes of Indian Navy and are designed to undertake anti-submarine operations in coastal waters, Low Intensity Maritime Operations (LIMO) and Mine Laying Operations. Keel laying of Yard 3034, last ship of the Project is yet another significant milestone in Indian Navy’s pursuit towards indigenous shipbuilding and is in consonance with ‘Aatmanirbhar Bharat’ and ‘Make in India’ initiatives of the nation.

Other Publications

Recent

Indra Successfully Tests Its Nemus Active Defence Radar On Leopard Battle Tanks
27-05-2025

Nemus is an AESA radar that plays a critical role...

Vision 2030 at Work: Building Saudi Arabia’s Industrial Backbone
27-05-2025

At the heart of the Arabian Peninsula, the Kingdom of...

Experia and OSTIn Launch First Space Summit@Singapore Airshow
27-05-2025

Experia Events, organiser of the Singapore Airshow, one of the world’s...

France and India Strengthen Space Ties at French Space Days 2025
27-05-2025

Business France India, in collaboration with CNES and the Embassy...

Wings India 2026: Showcasing India’s Aviation Ecosystem on the Global Stage
27-05-2025

The Ministry of Civil Aviation, Government of India under the...

Social Media Updates